In August 2012, the airports where Alshaa Left Banner, Alshaa Right Banner and Ejine Banner are located started construction at the same time, and were officially opened to traffic on Dec 17, 2013.
By 2020, the total mileage of highways in Alshaa League has reached 10,971 kilometers.
By 2020, the mileage of railway operation in the whole League reached 1,691 km. The Wuhai West-Jilantai Railway is 130 km long and the territory is 128 km long. The Gantang-Wuwei Railway has a total length of 172.2 km.