Shenyang metro lines switched to the winter schedule to cope with passenger travel demands. The new schedule starts on Nov 1 and will last until March 31, 2019.
According to the new winter schedule, the opening time for metro line 1 (going to 13th Street) is 6 am, while line 1 going to Li Ming Square starts running at 5:30 am. The opening time of metro line 2 (headed for Shenyang Aerospace University) is 5:30 am, while line 2 headed for Quan Yun Road starts at 6 am. All the metro lines stop operating at 10:20 pm.